14.04.2020: Preparation of the construction road
-
14.04.2020: Preparation of the construction road
-
14.04.2020: Preparation of the construction road
-
14.04.2020: Preparation of the construction road
-
14.04.2020: Preparation of the construction road
-
01.10.2020: Removal of the roof
-
08.10.2020: Removal of the roof
-
08.10.2020: Removal of the roof
-
08.10.2020: Deinstallation of the old wave maker
-
09.10.2020: Deinstallation of the old wave maker
-
09.10.2020: Removal of the roof
-
12.10.2020: Dismantling parts of the flume
-
12.10.2020: Dismantling parts of the flume
-
12.10.2020: Dismantling parts of the flume
-
12.10.2020: Deinstallation of the old wave maker
-
13.10.2020: Deinstallation of the old wave maker
-
20.10.2020: Dismantling parts of the flume
-
20.10.2020: Dismantling parts of the flume
-
20.10.2020: Dismantling parts of the flume
-
23.10.2020: Dismantling parts of the flume
-
23.10.2020: Dismantling parts of the flume
-
05.11.2020: Construction inlet/outlet structure west
-
11.11.2020: Construction of the deep section
-
16.12.2020: Construction inlet/outlet structure west
-
15.03.2021: Construction inlet/outlet structure west
-
15.03.2021: Construction works for the new wave maker
-
28.04.2021: Construction inlet/outlet structure west
-
29.04.2021: Construction inlet/outlet structure west
-
29.04.2021: Construction of the deep section
-
11.05.2021: Construction inlet/outlet structure west
-
11.05.2021: Construction of the deep section
-
02.07.2021: Construction inlet/outlet structure east
-
13.08.2021: Construction works for the new wave maker
-
20.08.2021: Construction works for the new wave maker
-
31.08.2021: Construction of the deep section
-
28.09.2021: Construction of the deep section
-
27.09.2021: Adaptation of "Block 0" for the new wave maker
-
05.10.2021: Construction inlet/outlet structure east
-
19.10.2021: Construction of the pump station for the current generation
-
15.11.2021: Construction inlet/outlet structure east
-
08.12.2021: Construction works on the new wave maker
-
20.12.2021: Construction of the deep section
-
06.01.2022: Construction inlet/outlet structure east
-
12.01.2022: Construction of the deep section
-
20.01.2022: Construction of the deep section
-
25.01.2022: Construction inlet/outlet structure east
-
25.01.2022: Construction of the pump station for the current generation
-
25.01.2022: Construction inlet/outlet structure east
-
07.03.2022: Construction inlet/outlet structure east
-
08.03.2022: Construction inlet/outlet structure east
-
08.03.2022: Construction of the deep section
-
05.04.2022: Construction of the deep section
-
08.04.2022: Delivery of the concrete stations
-
08.04.2022: Delivery of the concrete stations
-
11.05.2022: Preparations for laying the pipelines
-
14.05.2022: Lifting in the drive beam of the wave maker
-
14.05.2022: Lifting in the drive beam of the wave maker
-
16.05.2022: Lifting in the wave board
-
16.05.2022: Lifting in the wave board
-
16.05.2022: Assembly of drive beam and wave board
-
17.05.2022: Preparations for laying the pipelines
-
17.05.2022: View through the pump station
-
01.06.2022: View through the inlet/outlet structure east
-
01.06.2022: Laying of the pipelines
-
08.06.2022: Connecting the pipelines to the pump station
-
10.06.2022: Burying the pipelines
-
22.06.2022: Installation of the thrusters
-
22.06.2022: Installation of the thrusters
-
14.07.2022: Fully assembled thrusters
-
14.07.2022: Laying of the pipelines
-
25.07.2022: View through a pipeline on a thruster
-
01.08.2022: Installation of the concrete stations
-
01.08.2022: Installation of the concrete stations
-
12.08.2022: View on the wave board
-
29.08.2022: Ramp inlet/outlet structure west
-
02.09.2022: Ramp inlet/outlet structure west
-
08.09.2022: Escape stairs at the pump station
-
08.09.2022: Completion of inlet/outlet structure west
-
15.09.2022: Installation of the guiding vane drives
-
15.09.2022: Installation of the guiding vane drives
-
15.09.2022: Installation of the guiding vane drives
-
11.11.2022: Reconstruction of the outdoor area
-
11.11.2022: Reconstruction of the outdoor area
-
11.11.2022: Assembly of gauges at the wave board
-
15.11.2022: Installation of the control container
-
15.11.2022: Installation of the control container
-
15.11.2022: Installation of the control container
-
30.11.2022: Fully assembled guiding vanes
-
30.11.2022: Fully assembled guiding vanes
-
30.11.2022: Fully assembled wave board
-
30.11.2022: Reconstruction of the outdoor area
-
08.12.2022: View into the pump station